Westminster is an Adams County city of about 115,500 residents north of Denver, with electric service from Xcel Energy. Owner-occupied households make up roughly 64 percent of the city, where the median home was built in 1987 and the median home value is about $467,200. At this Front Range elevation, PVWatts estimates a south-facing array produces around 1,539 kWh per year for each kilowatt installed, so a 7 kW system generates roughly 10,773 kWh annually.

Local numbers

The Westminster baseline

A 7 kW south-facing system in Westminster produces about 10,750 kWh/year per NREL PVWatts. Pre-incentive install cost runs $18,900 to $21,000, with cash payback around 11 years before financing markup.

10,750 kWh/year

Annual production

PVWatts v8, 7 kW south-facing.

~$18,900 to $21,000

Net cash cost

After incentives, before financing.

11 years

Cash payback

No dealer-fee markup.

13 to 17 years

Financed payback

With typical dealer fees.

Utility context

The bill rules are local.

Most of Westminster is served by Xcel Energy. Net metering, rate trajectory, and program timing differ by utility; the Colorado state hub covers the cross-utility picture.

Xcel Energy Adams County Verified 2026-05-29