SUMMIT Energy Solutions

Forest Grove city reference

Solar in Forest Grove, checked against utility math.

A city-level guide for Washington County homeowners comparing quotes, system size, incentive timing, and Forest Grove Light and Power billing assumptions.

Reference ZIP
97116
Utility
FGLP
Focus
PGE exports + ETO incentives

Local numbers

The Forest Grove baseline

A 7 kW south-facing system in Forest Grove produces about 7,950 kWh/year per NREL PVWatts. Pre-incentive install cost runs $17,850 to $21,000, with cash payback around 14 to 18 years before financing markup.

7,950 kWh/year

Annual production

PVWatts v8, 7 kW south-facing.

$17,850 to $21,000

Net cash cost

After incentives, before financing.

14 to 18 years

Cash payback

No dealer-fee markup.

20+ years

Financed payback

With typical dealer fees.

Utility context

The bill rules are local.

Most of Forest Grove is served by Forest Grove Light and Power. Net metering, rate trajectory, and program timing differ by utility; the Oregon state hub covers the cross-utility picture.

FGLP Washington County Verified 2026-05-29